Building stairs is hard, but there’s no need to fear the stair monster!

We teamed up with The Home Depot @HomeDepot #homedepotpartner, and I’m going to show you how to build a strong, custom set of stairs, step by step.

And here’s the crazy thing: we scheduled an inspection for the end, so stick around to see if we pass or fail!

First, I measure from the finished basement floor to the finished first floor. The total height is 121 inches.

Dividing that by 16 gives me a riser height of approximately 7 9/16 inches. Always check your local building codes before building stairs because requirements can vary.

Next, I build the landing, calculating its height so it lines up perfectly with the stairs. One side is supported by a wall, and the other by joist hangers and a beam pocket.

I double up the end joists for extra strength, build the supporting wall, and install the remaining joists.

The number one enemy of stairs is squeaks, so I use LedgerLOK structural screws to secure the landing to the wall studs and minimize movement.

Then I apply floor adhesive, install the 3/4-inch subfloor, and fasten it with construction screws.

I ordered everything for this project through The Home Depot, including lumber, hangers, fasteners, specialty tools, and adhesive. Since this job is in the middle of nowhere, delivery saved me a ton of time driving back and forth to the store.

Now let’s cut some stringers!

I’m using straight 2x12s with as few knots as possible. The rise is 7 9/16 inches, and the run is 9 1/2 inches.

I lay out the steps using a framing square and stair gauges. These little tools keep the measurements consistent and make the process much faster.

I carefully cut the first stringer, making sure not to cut past the lines because that can weaken the board.

Since the treads are an inch thick, I also adjust the bottom riser to account for that thickness.

Before cutting the rest, I test-fit the first stringer and check that everything sits properly against the floor and landing. I even use sample flooring and a tread to verify the finished step height.

Once everything checks out, I use that first stringer as a pattern for the others. This is much more accurate than measuring every stringer individually.

I’m installing four stringers, spaced about 11 inches on center, to make the stairs strong and prevent bouncing.

I also attach 2x4 spacers to the outside stringers to leave room for drywall and skirtboards.

Is it just me, or does this look like a giant dinosaur mouth?

At the top, I use Simpson stringer connectors to secure the stringers to the landing.

At the bottom, I install a pressure-treated 2x4 plate against the concrete. I notch the stringers so they fit securely against it and fasten everything in place.

Since the stringers aren’t pressure-treated, I add sill seal to their bottoms to help protect them from moisture.

I install the outside stringers first, then the middle ones, checking everything with a level before fastening them.

A piece of scrap LVL underneath helps pull all four stringers into alignment. I also use structural screws to secure the outside stringers to the wall studs, making the staircase stronger and reducing movement that could cause squeaks.

Then I repeat the process for the shorter set of stairs leading from the landing to the first floor.

Because the landing flooring and stair treads have different thicknesses, I make a small adjustment to the bottom of those stringers to ensure the finished step heights match.

For now, I install scrap subfloor as temporary treads. Once the drywall is finished, we’ll add oak treads and painted risers.

These stairs are looking like a work of art!

And wouldn’t you know it? Just as I finished, the inspector pulled up.

I’ve had this guy before, and he’s super picky. He checked every screw and made notes on his tiny clipboard.

Luckily, we passed!

Building stairs takes careful measurements, solid connections, and attention to local building codes.…