
The Uptime Wind Energy Podcast
Allen Hall, Rosemary Barnes, Yolanda Padron & Matthew SteadAudio
- Format:
- Podcast
- New episodes:
- Several times a week
- Typical length:
- about 25 minutes
- Latest episode:
About this show
Uptime is a renewable energy podcast focused on wind energy and energy storage technologies. Experts Allen Hall, Rosemary Barnes, Yolanda Padron, and Matthew Stead break down the latest research, tech, and policy.
Covers: renewable energy, wind energy, wind turbines, energy storage, turbine reliability, blade manufacturing, wind energy policy, offshore wind, wind industry business, composite materials
Show details and episodes come from the publisher's public feed at weatherguardwind.com. Last updated . Names, artwork and text belong to their publishers.
Recently on this show
Summary of recent episodes, drawn from the publisher's feed.
Uptime is a podcast about wind energy and energy storage, where experts discuss research, technology and policy. Recent episodes cover Nordex losing a blade in testing, a 1,000-turbine study of which parts fail most, and blade quality from a consultant's view.
Cosmos
Similar in subject
- Interchange Recharged
Both cover: energy storage, renewable energy
Similar shows
Explore more
Episodes
Why Blade Repair Records Matter, w/ Rosemary Barnes
· 27 min
Rosemary Barnes, founder of Pardalote Consulting, (https://www.pardaloteconsulting.com/) joins to discuss repair records, serial defects, and blade inspections before a wind farm sale. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetNordex Loses a Blade, Siemens Gamesa Returns to Profit
· 28 min
Nordex loses a blade during testing in Latvia, Siemens Gamesa returns to profit, and Vestas orders fall 27%. Plus Ørsted earnings climb as injuries rise, and Windcatching lands €100 million. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetVestas Profit Misses Forecast, RWE Wind Farm Knocked Offline
· 5 min
Allen covers a Vestas profit miss, RWE’s Sofia offline, a £12B Norfolk deal, Siemens Energy at Berwick Bank, and a new O&M deal. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetWhat Drivetrain Failures Reveal, w/ Oskefer Consulting
· 29 min
Derek Gong from Oskefer Consulting, (https://www.oskefer.com/Renewables.html) joins to discuss drivetrain failures, OEM handoff gaps, and missed SCADA warnings. Reach out to Derek on LinkedIn (https://www.linkedin.com/in/drderekgong/). The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yet1,000-Turbine Study Reveals Which Parts Fail Most
· 33 min
A 1,000-turbine European reliability study finds pitch systems, controllers and power converters fail most often. Plus why failures climb in year nine and an offshore farm blind to lightning. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetVestas Turbine Tops 199-Meter Tower, OECD Flags China Subsidies
· 3 min
Allen covers a Vestas turbine on a 199-meter hub in Bavaria, Dominion’s 44 turbines up at Coastal Virginia Offshore Wind, an OECD report on Chinese subsidies, and Nordex’s push to keep non-Western turbines out of Europe. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetWhat to Know About Blade Quality, w/ Kronborg Consult
· 31 min
Jacob Kronborg, founder of Kronborg Consult (http://www.kronborgconsult.com/), joins to discuss blade factory quality, carbon pultrusion repairs, serial defects, and LEP.https://weatherguardwind.com/wp-admin/edit.php?post_type=post The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetOctopus Buys Golden Plains, Blade Defects, Hotel Pet Peeves
· 24 min
Octopus Investments buys Golden Plains stage two for over A$2 billion. Plus, the blade defects new owners miss in due diligence, internal inspections, and the hosts’ conference hotel pet peeves. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetMing Yang Firewalls Europe, US Turbine Orders Surge
· 7 min
Allen covers Ming Yang’s firewall from Beijing and Octopus Energy deal, US turbine orders hitting a three-year high, and Norway’s floating wind funding. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetHow Startups Find Problems Worth Solving, w/ Teemu Vekkeli
· 26 min
Teemu Vekkeli (https://linkedin.com/in/teemuvekkeli), Principal at Vekkeli Advisory (https://vekkeliadvisory.com/), joins to discuss VC versus bootstrapping, budget cycles, and problems worth solving. Plus why trust drives sales in Japan, what site technicians know, and why every pitch eventually has to convince the CFO. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. (https://weatherguardwind.com/striketape/) https://uptimetechnews.substack.com/accountSubscribe to Uptime’s Substack newsletter (https://uptimetechnews.substack.com/account). And check out Rosemary’s “Engineering with Rosie” (https://www.youtube.com/c/engineeringwithrosie) Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetMing Yang Eyes 33 MW Turbine, Greenvolt Delays FID
· 26 min
Ming Yang plans a 33 MW turbine while China pulls European tech out of its wind farms. Plus white-hat hackers reach 7.8 GW in Germany, Vårgrønn eyes a Greenvolt exit, and who really owns turbine data. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Announcer: The Uptime Wind Energy Podcast, brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit striketape.com. And now your hosts.Allen: Welcome to the Uptime Wind Energy Podcast. I’m Allen Hall, here with Rosemary Barnes, Matthew Stead, and Yolanda Padron. We were just discussing WOMA 2027, which is in Melbourne, March 3rd to the 5th. Registrations are coming in, and Rosemary was just scolding me about it. We have a lot of registrations in, and there are only 200 seats, so we need to be telling attendees to register now, right, Rosemary?Rosemary: Absolutely. Don’t do like I do and leave it to the last minute, because you might find yourself missing out. We’ve got a capped venue. Last year we were getting close to the maximum, but this year I think we’re going to have to cap it for sure.Allen: When we run out of seats, we run out of seats. And when you send me that nasty email saying, “Why can’t I get a seat at WOMA 2027?” I’m going to send it to Rosemary, and she’s going to call you and tell you to register early.Rosemary: We also have Direct Wind Services as the first sponsor. I’m not sure if you were aware of that.Allen: Yes. And Direct Wind Services is sponsoring Rosie’s blade course. What are we going to call that, Rosemary?Rosemary: I’m calling it A Blade Is Born.Allen: A Blade Is Born. Oh, How a Blade Is Born.Rosemary: Title TBD. Allen hates that title. That’s what we’ve actually been arguing about before the show. It covers what happens before the blade gets into the turbine and starts being the O&M team’s headache. What happens before then that you need to know about in order to do your O&M properly and make sure of everyone you’re relying on? You need some knowledge of the system to understand whether it’s believable when someone gives you a root cause analysis for a serial defect, for example. It’s all the things you need to understand about how blades are designed and certified, including testing, and then especially manufacturing.I’ve been fastidiously collecting sources from the internet that show the manufacturing process. It’s quite challenging to describe that process well, because everyone is so secretive. You’re not allowed in any factories anymore. But I put together a good package. It’s also a little bit of a taster for the longer course that Pardalote and Direct Wind Services have been putting on for blade training for asset managers and other wind energy professionals. So you can get a little bit of that for free as part of your WOMA attendance.Allen: So you can attend Rosie’s A Blade Is Born session on the Friday. But the only way you’ll be able to do that is to register, and you can register at womaaustralia.com. And you’d better do it pretty soon, otherwise you’re going to miss out.Poland Loosens Onshore Wind RulesAllen: Our first story is from PES Wind magazine, written by developer RP Global, and its question is who is best placed to build Poland’s next wave of wind. Poland loosened its siting rules in 2023, and it made some revisions to that just recently in 2026. The 2026 changes were about new grid laws, which are hopefully going to open up development.RP Global argues the winners won’t be the biggest developers, and that’s generally true worldwide. They’ll be the ones with projects that can actually get built, which is a huge problem in the United States and, evidently, in Poland. So Poland may be a really good test case for onshore…
Not rated yetTrump Delays Turbine Tariffs, Pentagon Approves Two Projects
· 5 min
Trump skips turbine tariffs, the Pentagon clears two wind farms, the DOJ targets Revolution Wind, and China pushes into Europe. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode transcript Happy Monday, everyone. Washington spent the week talking about national security. Of wind turbines. First… imports. This past Thursday… President Trump signed an order on foreign wind turbines. The Commerce Department says imported turbines and parts threaten national security. It gives two reasons. America depends on them. And they could be controlled from overseas… to shut down the power grid. The order names one part. The inverter. It says most inverters are made outside the country. But there are no new tariffs… for now. The Commerce Secretary and the Trade Representative will negotiate with trading partners instead. They have one hundred eighty days to report back. That puts the deadline in late April. Next… the Pentagon. About three hundred wind projects are stuck in Pentagon security reviews. On Thursday… two got through. One in Maine. One in South Dakota. The White House says more approvals are coming in the weeks ahead. Why now? Bloomberg reports the White House offered to free about thirty stalled projects. The price? Democratic votes for a Senate bill to speed up permits. But the approvals may come with strings. Some developers say the Pentagon could pull its approval later. And a permit that can be pulled is hard to finance. Senator Sheldon Whitehouse helped write the Senate bill. He calls Thursday's move a start. He wants a lot more. That same week… the Justice Department went the other way. It asked federal judges to send back the permits for three offshore wind farms. Revolution Wind… off Rhode Island. It has made power since March. New England Wind… off Massachusetts. And Maryland Offshore Wind. Government lawyers say the Biden-era approvals found harm to endangered species… and approved the projects anyway. That hit the Senate deal hard. Democrats signed on because the White House promised better treatment for wind. One part of the bill bars federal agencies from playing favorites between energy sources. Senator Whitehouse had a short answer. “This is how you blow up a permitting deal.” The Senate takes up the bill after the November elections. Finally… a view from Europe. The head of BMS Heavy Cranes says Chinese turbine makers are pushing into Europe. They are coming in through the east. Hungary. Romania. All the way up Europe's eastern edge. He says they are winning projects that Vestas does not win. So his cranes now work for Chinese customers. He admits it stings. He even bought a Chinese crane to test it. Why are the Chinese winning? Not cheap labor, he says. He toured a Chinese factory run entirely by robots. He says they win on technology. His one open question? How long the Chinese machines will last. So what does this mean for wind professionals? First… the trade fight may become a cyber fight. The Commerce Department order is about remote control… not price. Know where your controllers, converters and remote access come from. Expect regulators to ask. Second… watch the April deadline. The trade talks could end with new tariffs. If you sign turbine or parts deals this winter… decide now who pays if that happens. Third… read the favoritism language in the Senate bill. Does it cover permits already granted? Or only new ones? If only new ones… it will not help the three wind farms in court today. So Washington spent the week asking if a wind turbine could be turned against America. Europe is asking a different question. How do you compete with a factory run by robots? And that is the state of the wind industry for the 26th of October 2026. Join us for the…
Not rated yetTightline and Avient Remove Peel Ply From Carbon Planks
· 25 min
This week we're revisiting our discussion with Andrew Davis of Tightline Composites and Brad Schmidt of Avient, who discuss a resin additive that eliminates peel ply on carbon planks. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Welcome to Uptime Spotlight, shining Light on Wind. Energy's brightest innovators. This is the progress powering tomorrow. Allen Hall: Andrew and Brad, welcome to the show. Thanks for having us. Thank you. Well, we're gonna start off by talking about carbon protrusions, because that's the focus of your technology, title IX composites, and there's been some recent advancements that are really fascinating, but I, I kind of wanna go back a minute because carbon pull protrusions are the future, even though we're still making some fiberglass blades that'll have a limited lifespan. We're gonna be moving to carbon protrusions because the strength and the weight. And the cost, simplicity of it, uh, just makes carbon protrusions the future. And Tightline Composites has been key in that mold of making these, uh, carbon planks and getting 'em out to industry. I. But one of the big problems with any sort of carbon plank product is it [00:01:00] usually has a peel ply. And Andrew, you wanna talk about what that peel ply does and why it's used and why we need it. Andrew Davis: You really need that surface energy created by removing the peel ply to, to get an effective bond as you're building your spark cap. And so for years, this has just been considered a necessary evil. Uh, in terms of creating, creating that effective bond. And, and that's, that's the world we've lived in for the last 10 years. Allen Hall: And a peel ply for those who are not deep into the composite industry. Peel, ply is a removable. Ply a fabric that's that's applied over the carbon on the outside and it's kind of thicker and it has, uh, this kind of rough and surface. So when you build the protrusion, you got these two layers of this peel ply on either side, and it travels with the product. So as, uh, tight line sends out product, these, these peel plys go with it. [00:02:00] And ideally when they get to the factory, the, the people on the floor. Pull this peel play off and it's not fun to peel off one and two, it's kind of invisible. So you can forget that it's there and install it in ablaze. And Joel, you have seen that in the field. You've seen protrusions where they have the ply still attached. Joel Saxum: Yeah, it's, it's like, um, Alan, we saw one of the other day too, where it was like there was still a coating on a down conductor, right? So like, if you. If you try to embed this product, the, the idea behind peel and the peel ply is you peel the peel ply, and now you have a prepped surface that can be chemically and mechanically bonded to easier or in, in, in, in a much better way, as designed. So if you forget to pull that off, now you have a structural element inside the PLA or inside of whatever you may be building in composites. That doesn't have the ability to bond properly to that protrusion, to that carbon plank or to that glass plank. Uh, and if that's the case, you lose, I can't [00:03:00] put a number to it. Right. But you lose an immense Andrew Davis: amount of structural strength. And Joel, just to underline your point, we've heard from customers who will remain nameless that it is, it, it happens that, that this will get caught on scan. Uh, when the blade is completely done, and then the entire blade has to be scrapped. There's no, there's no fixing it. Allen Hall: Yeah. That, that, that gets expensive. Real quick, you're talking about a hundred thousand dollars blades for onshore. Forget about offshore for a minute. An offshore blade, multi…
Not rated yetNordex Q3 Orders Jump 30%, Vestas Bets on Australia
· 25 min
Nordex Q3 orders jump 30% and Vestas lands about a gigawatt in Australia. Plus why turbine factories skip Australia, high project costs, and whether batteries can replace coal. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Allen Hall: Welcome to the Uptime Wind Energy Podcast. I'm Allen Hall, and I'm here with Matthew Stead, Yolanda Padron, and Rosemary Barnes, who is in Sydney, Australia, attending some business conferences. Rosemary?Rosemary Barnes: Right now I'm in Sydney. I was at an ARENA innovation event last night, and it was matching up startups with investors. It was a great event, actually. I got invited because I was moderating a panel. Not all startups, though some of them were. I had the head of sustainability at Qantas there, Fiona, and then Katherine from Brighte. They do a bunch of financing, mostly for distributed energy and household consumer energy products like rooftop solar and batteries. And then Jack from Neara, and they do grid simulation. It's pretty cool. If you run a network and you want to know how to best improve resilience while spending the least money, they'll model things like, okay, if this particular pole falls over, then this will happen. And you can improve resilience by just adding a guy wire to this one asset, and you're not going to take down any additional poles.Anyway, we talked about the Australian energy landscape and investing in technologies in those areas. Some of the strengths we have in Australia have a lot to do with distributed energy. We're really leading the world there, and there's heaps of opportunity for innovation and for companies to solve problems in these spaces. I also talked about some of the categories that aren't so easily decarbonized.We had Qantas there, and they're investing a lot in sustainable aviation fuel. I really enjoyed talking with Fiona before the event, because one of my problems is that I travel so much for work. I do make sure the travel I do is for the climate benefit, so I don't ultimately feel guilty about it, because it has more impact than the emissions of the flight by a long way. However, I do want to decarbonize aviation. I love to travel, and I would like to be able to continue to do that in the future.So I talked with her about that. I really want to be able to buy sustainable aviation fuel, because one, it actually does something, and two, it's an industry that needs to grow and scale, and I would like to support some of that scale-up in an appropriate way. She let me know they've got a small business scheme now where you can get in touch with them and buy it. We also discussed maybe a collaboration with Engineering with Rosie, a video about some of the projects they're investing in. So that was really cool.Later in the evening, five startups pitched to investors, and it was a really great investor-to-founder ratio in the room. For every startup there trying to get money, there were probably five investors trying to find people to give money to. It's definitely a good event to go to, and they do it annually, so it's one to keep on your calendar.Allen Hall: Did you break out your checkbook and invest in one of these companies?Rosemary Barnes: I would really love to. My investment strategy is that I invest $1,000 to $5,000 in companies. I don't do heaps of financial due diligence. I just do the technical due diligence: is this a real problem that's going to need to be solved, do I trust the engineering, does the team seem like they get it? That's as far as I go. And I invest enough money that if it goes wrong, it's not the end of the world. I have lost all of my money on a few investments, and I've made 20 or 30 times on some others, so it works. I would love to give $1,000 to…
Not rated yetTrump Targets Revolution Wind, Nordex Q3 EBITDA Doubles
Allen covers the Trump administration’s bid to reopen Revolution Wind’s permit, a bipartisan Senate permitting deal, Nordex’s doubled third-quarter profit, and GE Vernova’s new wind chief. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us!
Not rated yetHow CICNDT Qualifies Inspectors for Complex Blade Scans
· 26 min
Jeremy Heinks, founder and CEO of CICNDT, joins to discuss the inspector shortage, Level III oversight, blade samples, drone thermal limits, and IEC updates. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Allen Hall: A lot is happening in your world. And in our world, too, as lightning protection people, because we are all dealing with damage to composite structures and wind turbine blades. Over the last couple of months, there have been some really complex problems in the field. And what I am seeing, and maybe you're seeing the same thing, is that some of the technicians out there trying to scan blades are just not qualified to do some of these complicated inspections. Blades are getting very complex now, with carbon in them and all the bonding issues. Are you seeing something similar from where you sit?Jeremy Heinks: It's not just service. It's at the supplier level, and it's at the OEM level, where they're trying to do something, but it's hard to come by the right people and make sure you're following a standard of sorts. But yeah, we're seeing that there's a genuine lack of properly qualified and certified people doing the work.Allen Hall: Is that a training issue, or just because there's so much demand for that expertise?Jeremy Heinks: A little bit of everything. Wind, even though it's been around for a while, is still relatively new to a proper inspection system. So having the right training in place, not getting taken advantage of by training centers, and having training that's actually focused on what we use for day-to-day inspection of blades is one thing.The other side of it is there's a global shortage of NDT technicians. It's just like any of the other trades that are really in demand. If anybody wants to get into something and have, not an easy life at work, but a decent chance at success and making a decent amount of money, then NDT is definitely the way to go, because there are huge shortages. Aviation and space programs are booming right now, and they're all looking for technicians.Allen Hall: Yeah, I've seen a lot of requests out there, particularly from defense companies that are building complex composite structures, and the job postings for NDT personnel. And they're paying really good money right now to find those people.Jeremy Heinks: Oh, absolutely. We just got a request from one of the big names here in the US for 86 technicians. And I'm like, there's no such thing as 86 technicians out there.Allen Hall: Yeah.Jeremy Heinks: You'll get one or two here and there, but there's just not that many available at the moment.Allen Hall: Well, back in the blade world, we're kind of wrapping up the blade season this time of year, and it gets a little bit heavy as everybody realizes, oh, I have some damage I didn't see before. A lot of drone inspections are happening, which then draw you in on NDT. As an operator, what are people to do here? I hear a lot of complaints that it's really hard to find somebody who knows what they're doing. I always point them to CIC and tell them to call you and get started there. But what should they be doing, and what should they be looking for when they have complex composite problems?Jeremy Heinks: Like you say, a lot more people are bringing inspection companies in, which is great, and we need to see that. But once you've made the decision that you need NDT, you've got to make sure you're getting what you pay for and the quality of service you expect to receive.So typically there are some questions you want to ask. Do you have a Level III in the method of inspection who is going to oversee everything from education to certification and qualification? And if they have Level IIIs, how do they take care of their…
Not rated yetChina Barred Vestas Software, Ørsted Buys Chinese Monopiles
· 20 min
Vestas CEO Henrik Andersen says China barred Vestas from monitoring its own turbines. Plus Ørsted takes heat for Chinese monopiles, India’s blade design gap, and tents that beat weather delays. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript The Uptime Wind Energy Podcast, brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now, your hosts.Allen Hall: Welcome to the Uptime Wind Energy Podcast. I'm Allen Hall, here with Rosemary Barnes, Matthew Stead, and Yolanda Padron, and we're getting ready for WOMA 2027. WOMA in Australia will be in its third year, and we're going to be at the Pullman East Melbourne. It's the same location, but the name of the hotel has changed. We'll be there March 3rd through the 5th. We've heard from a number of OEMs, which is really great, but there's one in particular that hasn't registered yet, which is GE Vernova. We thought they'd be first in line. That was my bet, that GE Vernova would have been signed up and ready to go. But there's a latecomer to this party. Rosemary, how do we get GE Vernova to show up to WOMA?Rosemary Barnes: I don't know. I don't have so many links to the company as I used to, and I don't always have the best luck getting in touch with my old colleagues. I guess they're busy, because there's not so many of them left there now. We have so, so many turbines here, and our asset managers are really engaged on all of the technical issues. They really want to understand what technologies are available, both for new projects that are coming up and for operations. The operations teams are getting involved more and more in purchasing decisions. Their opinions are being asked for. The Australian wind industry is a lot different than it was five years ago. People didn't know so much, and I think they relied on the OEMs' word for what we need in Australia and what's available. Whereas now, asset owners know what we need and what kind of problems we have, and they're really looking for technical information about solutions. The companies that are at the event to provide that information are the ones people are going to feel positively about. So I would recommend getting there to everybody, not just GE, but all OEMs from any part of the world. Not just Western ones, but Chinese ones too would be really great to see.Allen Hall: And Matthew, if GE Vernova wanted to register for WOMA 2027, what would they do?Matthew Stead: They would very easily go to WOMA2027.com and register. It's that easy. That's all they have to do.Allen Hall: And we'll stop talking about it.Matthew Stead: On the agenda, there is a specific session that OEMs are attending, and the intention is that the OEMs can have a good, open discussion about what's going on in OEM land and get familiar with the audience. Then they can get questions answered right there on the floor, which is really, really important for the customers. Most all the operators in Australia and the surrounding areas will be at WOMA 2027, so it's a good opportunity to talk to your customer base.Allen Hall: That's why we're recommending all the OEMs show up this year. Hopefully GE Vernova does it.Vestas CEO on China and EuropeAllen Hall: And speaking of OEMs, Vestas is in a bit of a unique spot, because the CEO of Vestas, Henrik Andersen, had an article in Fortune magazine. And I thought, that's unusual. Why is he in Fortune magazine? Well, it's a little bit of a life story, growing up as a kid and dreaming of wind turbines. I guess that's a thing in Denmark. But he says that Europe must shed its naivety. Rosemary, five years ago, Chinese authorities barred Vestas from monitoring or running its own software on turbines in…
Not rated yetØrsted Finishes Drone Trial, Iberdrola Exits South Korea
· 3 min
Allen covers Ørsted’s Hornsea 2 drone trial, the DeepWind test site, Germany’s proposed land rent cap, and Iberdrola’s Korea exit. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Good Monday everyone. Every wind farm is at least a twenty-year promise. This week ... the industry learned which risks it can engineer away ... and which ones it cannot. Start in the North Sea. A delivery just went out at Hornsea 2. No crane. No vessel at the base of the tower. No technician hauling a heavy bag up the turbine. Ørsted and Skyports just finished a four-week cargo drone trial there. The drones carried maintenance kits from the service vessel to the top of the turbine. Each kit held the tools and parts for one job. Each one weighed fifty-five to sixty-five kilograms. The kits arrived before the technicians did. When the work was done ... the drone flew them back. A new automatic hook picked up each load. Nobody had to clip it on by hand. And the turbine kept making power during the delivery. Then came the milestone. The team flew its first delivery beyond visual line of sight inside a working wind farm. About four kilometers ... run from the vessel. Britain's Civil Aviation Authority cleared the airspace. It says routine flights like this are the next goal. Ørsted's project lead says the trial confirms the plan. Drone maintenance is moving into routine operations. Stay in Britain ... where the next generation of offshore wind is getting a proving ground. The government's research agency just gave three million pounds to the European Marine Energy Centre. The money moves a project called DeepWind toward a final investment decision. DeepWind would be a national test site for floating and deepwater wind. The target is twenty thirty. The center says Europe's test sites don't offer the depths and seas that Britain's future projects will face. Testing a floater in calm water is one thing. Surviving a deepwater winter is another. Moorings, anchors and dynamic cables would all be proven at full scale. The center's operations director says the goal is simple. Make deepwater wind insurable ... and bankable. Three million pounds won't build it. It pays for two years of design, permits and planning. And the center is still asking developers and suppliers what they need the site to do. So the engineers are taking risk out. The politicians ... are putting some back in. Germany wants to cap what wind farms pay for land. Under a draft reform of its renewable energy law ... rent could not top three and a half percent of a wind farm's yearly revenue. The cap would last twenty years. It would even cover some leases already signed for projects not yet running. The first draft said two and a half percent. The states and the industry pushed it up. Germany's municipal utilities back the plan. They say it could save about thirteen billion euros in support payments by twenty forty-five. A landowner would still get about thirty-two thousand euros per turbine each year. But eighteen banks wrote the ministry an open letter. They say the cap adds uncertainty. And checking every lease for twenty years costs money. Enough money, they warn, to wipe out the savings. Germany's renewable energy federation says one cap can't fit every region. Forest owners and family farms go further. Their legal opinion says the cap may clash with Germany's constitution. And a landowner who doesn't like the deal ... can simply say no. Now to Spain ... where one of the world's biggest wind companies explained why it walked away from South Korea. Iberdrola signed a deal with GS Energy in twenty twenty-one. It never built a thing there. Iberdrola's head of international business says the problem was not the wind. It was…
Not rated yetHow DTU’s Rain Test Facility Predicts Erosion
· 29 min
Rosemary visits DTU Wind & Energy Systems in Denmark, where Nicolai Frost-Jensen Johansen explains rain erosion testing, tip speed, and LEP defects. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript Announcer: Welcome to Uptime Spotlight, shining light on wind energy’s brightest innovators. This is the progress powering tomorrow.Rosemary Barnes: I’m here at the Technical University of Denmark, Risø campus, with Nicolai Frost-Jensen Johansen. You’re a development engineer here, working in the rain erosion test facility, right?Nicolai Frost-Jensen Johansen: Yes. Rain erosion is the main topic I work on most days. Besides that, we’re in the section for Mechanics of Damage, so we spend a lot of time on fracture mechanics as well. A lot of those meet together in the field of rain erosion.Rosemary Barnes: It’s a complicated field with lots of different facets, and I think it’s still developing fast. Our understanding is definitely not complete. I understand you’ve already done an episode with Allen about the rain erosion testing machine, but for people who haven’t seen that, maybe we could quickly explain what rain erosion is.Nicolai Frost-Jensen Johansen: Our focus here is to mimic, as well as we can in a lab setting, the process of rain erosion on turbines. For those who don’t know, as turbines rotate in a rainy environment, and in some of the more severe weather in Australia, the droplets impinge on the leading edge of the blade. Over time that builds up fractures and damages the polymers, composites, or whatever protective solution is on the edge, and it erodes or falls off.The goal is not to test on a real turbine, but to do it at lab scale. What has now become the industry standard is machines like this one, a whirling arm rain erosion tester from R&D Test Systems. I think there are about 20 of this type of machine in the world now. As you might be able to see in the background, we have a big rotor where the test specimens are mounted. We spin them underneath an artificial rain field, and as the blades spin they impact the droplets. That way we mimic, as closely as we can, the same process as on real turbines.Rosemary Barnes: So leading edge erosion wears away the surface and causes two problems. One, the aerodynamics are affected, so you get less power. And two, it will eventually eat through the laminate in the blade.Nicolai Frost-Jensen Johansen: Then you get into a structural repair.Rosemary Barnes: A structural problem, right. Both of those are bad, and you want to prevent them. You don’t want to be climbing up your wind turbine every year to replace this stuff. Ideally you would have a blade that never eroded over its entire lifetime, or at least you’d minimize the number of times you have to reapply protection.That’s why people manufacturing new leading edge protection products want to test them and see how they’ll do in the field. But if you just put a product in the field, it will take a full lifetime before you know if it lasts a full lifetime, unless it fails earlier. So they bring it here, and the goal is to accelerate that testing so you can figure out in a few days or weeks how it’s going to last.If you want to reproduce what happens in the field, tip speed on a wind turbine blade is maybe 90 to 100 meters per second. That’s about 360 kilometers an hour, like a racing car. So you spin at that speed and dump water on it, trying to deliver a lifetime’s worth of water in one go. And you’re saying 1,600 hours of rain is about what a wind turbine would see in its lifetime?Nicolai Frost-Jensen Johansen: It depends a little on the approach, because there are different ways of accelerating. In a normal tester it would take about 1,600 hours to simulate roughly…
Not rated yetWhat Rosie Learned in Europe’s Wind Turbine Test Labs
· 29 min
Rosie returns from Denmark and shares her experiences seeing DTU blade testing, a lightning lab, and a 15 MW Vestas test turbine. The Uptime Wind Energy Podcast is brought to you by Weather Guard Lightning Tech, creators of the StrikeTape Ultra LPS retrofit. Subscribe to Uptime’s Substack newsletter. And check out Rosemary’s "Engineering with Rosie" Youtube channel. Have a question we can answer on the show? Email us! Episode Transcript What Rosie Learned in Denmark's Blade and Lightning LabsIntro and Risø blade testingAnnouncer: The Uptime Wind Energy Podcast, brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit StrikeTape.com. And now your hosts.Allen Hall: Welcome to the Uptime Wind Energy Podcast. I'm Allen Hall, and I'm here with Rosemary Barnes and Yolanda Padron. Rosemary just came back from her long trip to Germany, and a good part of it was also spent up in Denmark. Rosemary, you visited a number of wind-related companies on your travels, so give us a little update.Rosemary Barnes: I started in Copenhagen and then went over to Roskilde, mostly to see the rain erosion test facilities. But I also got a tour of the rest of the testing, mostly blade testing. There's a really interesting history to that facility. It started out as nuclear power research and had a reactor there. I didn't even realize that.Yolanda Padron: Yeah.Rosemary Barnes: And incidentally, the reason it turned into a wind facility is that they already had all of these amazing wind measurements for the site. That's super important if you've got nuclear power. If there's a meltdown, you need to be able to track where the fallout is going to go. So they knew the wind speeds in the region really well. I was told by my friendly guide that that's the reason it was seen as a really good place to get started on researching wind energy in Denmark. They could put a turbine up knowing what was going on with the wind resource there.Allen Hall: Niels Bohr worked there, right? Is that part of the history?Rosemary Barnes: He worked there. I think it was his facility. I think he set it up. I didn't plan to talk about this, and I haven't actually verified any of it. I'm just remembering what I was told weeks ago. My understanding is that he set it up to do nuclear power research. They don't do that anymore, but they do a bunch of energy work. Mostly it's wind energy, and then a bit with the grid. They're doing some interesting trials with EV charging and how that can integrate into a grid powered by variable renewables. They've got their own little microgrid going on there, and if you participate in the trial, I think you can charge your car for free. All of the businesses I visited in Denmark had rows and rows of EV chargers, though mostly not free.Allen Hall: So you went to the research labs at Risø, the structural labs there. Did you walk through where they were doing blade testing and some of the structural testing?Rosemary Barnes: Yeah. There's actually an American guy there, Derek. He was working at GE in America before that and had worked for TPI for a while, so he brought that expertise to Risø. They've got a bunch of test rigs in there for small blades. I can't remember the exact length, but maybe 20 meters.Allen Hall: Twenty. Yeah.Rosemary Barnes: Which was once a full-scale wind turbine blade, but now it's small scale. It's mostly for research, trying out various new things. They produce blades for other research facilities as well and test them, and they're trying out some new manufacturing techniques.They're also trying new testing techniques. Normally when you test a wind turbine blade, you start with a static test. You basically get some ropes and pull on the blade hard enough to represent the largest gust that blade should ever experience in its lifetime. After that, you do a fatigue test, where you flap it up and down and side to side, one after the other. That takes months. For really long blades…
Not rated yet